- Equipment handling and installation
- Precision equipment installation
- Electrical installation engineering
- Industrial pipeline engineering
- Ventilation duct Engineering
- Steel structure engineering
- Equipment maintenance
Case
Contact us
TEL:022-24832616
FAX:022-24982771
PHONE:13820942008
MALI:tjbobeijd@163.com
ADDRESS:Dongli Economic Development Zone, Tianjin, 11 weft Road, No. four, Fortune Plaza, A, block B, floor 29, No. 8
您當(dāng)前的位置:Home >> News Center >> Company >> Browse
High safety and high quality mechanical and electr
Time:2017-06-03 Author: Hit:1139
With the standardization of production equipment, raising the level of modernization, especially the application of automation equipment, electrical and mechanical equipment installation, debugging process is more complicated, specialization, professional installation of equipment gradually tilted to the technology intensive direction for mechanical and electrical equipment installation and construction period caused considerable obstacles.
The follow-up work will be put into production as soon as possible. To achieve this goal, debugging is an inevitable process, equipment assembly examination comprehensive is the foundation of the successful completion of commissioning work and prerequisites, need to re assemble equipment integrity, safety and installation conditions and inspection work. In the process of debugging, the corresponding mechanical technicians and auxiliary personnel must complete the commissioning process in time, and be more familiar with the operation of the main points of the equipment, basic steps and functional control methods.